The Traffic Police Brigade of Nanning Public Security Bureau has recently issued a traffic safety reminder. To facilitate the smooth execution of the "Water Pipeline Emergency Repair Project" along the auxiliary road on the south side of Minzu Avenue (stretching from Chaoyang Road to Gucheng Road) and to ensure safe and unobstructed traffic, construction commenced on August 23 and last until September 1. During this period, barriers measuring 5 meters in length and 3.5 meters in width will be installed. However, the remaining section of the auxiliary road will continue to accommodate mixed traffic for both motorized vehicles and non-motorized vehicles.