Brief Introduction to the Project of Comprehensive Improvement of Chaoyangxi River

Date:2008-09-30
Chaoyangxi River is a major inland river of Nanning with the river course of 14.28km long, total drainage area of 24.4square km, along the bank of which there are dozens of factories, mines, enterprises and 271,000 residents. There were as much as 11.63 m3 of industrial waste water and sanitary sewage directly discharged into the river. To improve the ecological environment along both banks of Chaoyangxi River, CPC Nanning Committee and Nanning Government decided to implement the project of comprehensive improvement of Chaoyangxi River.<BR> <BR>The project of comprehensive improvement of Chaoyangxi River is a systematic project which involves improvement of the river course, flood control and prevention of water-logging, sewage treatment, transformation of residential areas, transformation and expansion of rain and sewage pipeline network, disposal of solid wastes, greening, and organization buildup, etc. The budgetary estimate of the project was 800 million yuan.<BR> <BR>The phase-I project (the section from Dakengkou to No.13 Middle School) for the comprehensive improvement of Chaoyangxi River adopted an open-style design, which emphasized the idea of being “people-oriented” and established the principle of environment greening and landscaping. With the aim of building the multi-functional, public, and open-style riverside greening and landscaping integrating leisure, recreation, and sightseeing, the greening design was made through the concise and united method. There are two large squares and two leisure gardens along the river as designed. In the sections with dense population along the river, small-scale gardens and green areas are built.<BR> <BR>The phase-II project (the section from No.28 Middle School to No.13 Middle School) of Chaoyangxi River is about 3km long and this section is covered, that is, a two-hole enclosed conduit of reinforced concrete is built in the main river course with the total length of the trunk line of 3,022m long. All along the section is an open square with nice greenery, and among the landscaping design are 4 sculptures, and 1 large music fountain. The phase-II project of Chaoyangxi River was all completed on December 31, 2002, and the landscaping projects of all the sections are good as assessed.<BR> <BR>When the project of comprehensive improvement of Chaoyangxi River is over, Nanning has set up a well-run sewage collection and transmission system, drainage system, sewage monitoring system, and sewage management organization. The urban area’s flood control and water-logging drainage capacity are thus enhanced, Chaoyangxi River takes on a new look when built into a strip park of special Nanning landscaping and cultural contents.
SHARE TO:
Copyright Nanning Municipal Government All Rights Reserved.
englishinfo@nanning.gov.cn Your kindly feedback will be highly expected.
NANNING—CHINA
www.nanning.gov.cn 桂ICP备05000843