Nanning introduces temporary approach to regulate sponge city

Date:2018-07-09

Recently, it was learned from the Nanning Municipal People’s Government that the “Interim Measures for the Management of the Sponge City Planning and Construction in Nanning” (hereinafter referred to as the “Interim Measures”) was implemented on July 1 and is valid until July 1, 2020, and is applicable to the new construction, reconstruction and expansion projects within the urban built-up area in Nanning. The “Interim Measures” proposes that the construction of sponge city should adopt the engineering measures such as “Infiltration, Stagnation and Drainage”, strengthen the urban planning and construction management according to the concept of ecological civilization construction, give full play to the absorption, infiltration and slow release of rainwater by ecosystems such as buildings, roads and water systems, and effectively control the runoff of rainwater, so as to realize natural accumulation, natural infiltration and natural purification, and protect and restore the original ecosystem of the city.

SHARE TO:
Copyright Nanning Municipal Government All Rights Reserved.
englishinfo@nanning.gov.cn Your kindly feedback will be highly expected.
NANNING—CHINA
www.nanning.gov.cn 桂ICP备15000808号