  ¢ñ. Project Name: Nama Purified Water Works
  ¢ò. Industrial Category: Industry
  ¢ó. Type of Construction: New Construction Project
  ¢ô. Construction Period
  ¢õ. Construction Scope and Scale
  To build a purified water works with an annual production of 3 million barrels, covering a total area of 60mu. The workshops will adopt the light steel structure popularly used nowadays. The equipment will be imported from Netsal of Swiss and Kister of Germany.
  ¢ö. Project Site: Recreation Park with Nama Characteristics in the Coastal Economic Corridor Development Zone
  ¢÷. Construction Conditions:
  ¢¡.The Development Zone is located in the south of Nanning and 5km away from Nanning. The Development Zone is the biggest industrial park in Guangxi for private enterprises where the purified water consumption population is big.
  ¢¢. Nama is in possession of a stable and pollution-free ground water source. The water is rich in minerals and the quality complies with the hygienic standards stipulated in GB5749-85.
  ¢£. The Development Zone provids the investors with low cost and high quality service policies. Both hard and soft environment for investment is excellent.
  ¢ø. Total Investment and Capital Composition: RMB 60 million.
  ¢ù. Capital Source: Introduced capital: RMB 40 million; bank loans: RMB 20 million
  ¢ú. Pattern of Cooperation: Cooperation, or joint venture and/or sole investment
  ¢û. Analysis on Market and Anticipated Economic Benefits
  ¢¡. The purified water market in China is now developing quickly. The annual growth rate exceeds 20%. However the barreled purified water in Guangxi¡¯s market is just beginning. The consumers will be mainly the enterprises, public undertaking units and institutions and organizations. It can be seen that the market for drinking water is of high potential.
  ¢¢. Anticipated Economic Benefit: Annual production: 3million barrels; annual sales revenue: RMB 35million; recovery period for investment: about 5 years
  ¢ü. Progress of Preparation Work: The Planning Design and the Project Proposal have been completed.
  XIII. Project Competitive Advantages
  XIV. Project Owner: Administrative Committee of Costal Economic Corridor Development Zone
  XV. Contact
  Contact Person: Huang Guohua